in Hockenheim
WPG LOG3

Hockenheim

halls: 9,560 sqm, office: 226 sqm

hall1: 106/57/15 m. hall2: 69/51/11.4 m. office: 21/11/8 m

Logistics building, Office buildings

turnkey

July 2012 - Jan. 2013

This is the third time BREMER AG has been engaged to undertake a construction project for Weidenhammer. The contract is for the construction of a new logistics building in precast reinforced concrete elements with a cassette and trapezoidal sheet metal facade. The roof is of trapezoidal sheet metal with insulation and impermeable membrane. The frontal office building adjoining the hall is realised as a precast reinforced concrete element structure. The hall is divided by a partition wall of the standard required to separate rental areas. The halls are fitted with sprinklers.
Logistics building with adjoining two-storey office building.