in Butzbach
Loft Estate logistics centre
Butzbach

29,900 sqm

201 / 128 / 12 m

Logistics building

turnkey

Aug. 2014 – Aug. 2015

A special stylistic note is added by the design of the facade: while the high-bay warehouse is clad in vertical insulated panels, the other hall sections feature insulated panels in a contrasting horizontal arrangement. The administrative section is furnished with a special facade that clearly signals its purpose and indicates the entrance for visitors. The attractive look created by the BREMER precast reinforced concrete elements underlines the importance attached by the occupant to top quality and customised design.
Modern look for full-range cosmetic logistics. At a convenient location in Butzbach between the A5 and A45 motorways, BREMER has started construction of a logistics centre for the storage, picking and distribution of cosmetic products. With a floor area of 29,000 sq m, the facility will consist of two hall sections, a high-bay warehouse and a two-storey administrative section with an integrated mezzanine level along the full length of the loading zone. In addition, the fixed-price turnkey contract includes complex special foundation work, the envelope of the high-bay warehouse and the completion of all exterior facilities.