Bremerbau
Deutsch | English
Solid construction to perfection
 COMPANY 
 Business Activities 
 Current contracts 
 Press 
 References 
HomeContactJobsDirectionsDownloads
 
 Logistics Buildings
 WPG LOG3 in Hockenheim
 Verdion logistics centre in Großkugel
 Verdion logistics centre in Berlin Schönefeld
 „amazon“ logistics centre in Pforzheim
 „amazon“ logistics centre in Koblenz
 Automotive logistics centre, Irl, Regensburg
 logistics centre in Gera
 logistics centre Campus in Böblingen
 CONTI DISTRIBUTION CENTER in Ingolstadt
 WPP ZWENKAU 2 in Zwenkau
 Logistics centre in Niederaichbach
 LOXXESS, Bor (Czech Republic)
 greenfield distribution centre in Dornstadt
 logistics service building in Köln-Niehl
 Goodman - DHL cargo center in Rheinberg
 Goodman - DHL cargo center in Graben
 logistics centre „amazon“ in Graben
 logistics centre „amazon“ in Rheinberg
 Distribution Centre in Graben
 ING Main Log 3 in Neu-Isenburg
 AMB Distribution Center in Obergeorgswerder
 XXXLutz in Uffenheim
 WPG LOG2 in Hockenheim
 Fiege logistics centre in Mönchengladbach
 KRUG logistics building in Bebra
 Logistics building in Hamm
 Logistic center DC3 in Hannover
 Logistics building in Frauenaurach
 Goodman logistics centre in Langenbach
 ING logistics centre in Neu-Isenburg
 Warehouse extension in Halstenbek
 Warehouse in Aurach
 Central spare parts warehouse in Sachsenheim
 Wortmann logistics centre in Detmold
 Central warehouse in Ampfing
 STEINLE in Schwieberdingen
 Logistics centre in Hamburg
 Fiege Mega Center in Neuss
 Amazon Logistics Centre in Bad Hersfeld
 Fiege in Bremen
 Logistics hall in Hamburg
 Furniture logistics centre in Uffenheim
 Warehouse and dispatch hall in Hamminkeln
 DHL handling hall in Nuremberg
 Logistics centre in Neufahrn
 Central logistics centre with photovoltaic system for Corporate Express Deutschland in Waldlaubersheim
 DHL Health Care Centre in Unna Garbe
 GVZ Phase I in Bremen
 H&M distribution centre in Hamburg-Allermöhe
 Fiege Mega Center in Lahr
 Antalis in Frechen
 Amazon logistics centre in Leipzig
 TNT logistics centre in Wolfsburg
 MCC Smart Center in Böblingen
 TNT logistics centre in Straubing
 High-bay warehouse in Kaltenkirchen
 Refrigerated storage facilities
 Stadiums
 Furniture Stores
 Production Facilities
 DIY Centres
 Retail Facilities
 Multi-Storey Car Parks
 Office Buildings


STEINLE in Schwieberdingen
   
  Facts & Figures   

Building data
Location: Schwieberdingen
Floor area: 15,600 sqm
Length/width/height: 120/84/13 - 110/54/8 m
Type of building: logistics building 
Scope of supply and services: turnkey incl. design and engineering services 
Year of construction: 2009  
Period of construction: March 09 - Dec. 09 

Special features
This warehouse and handling hall is the first construction project undertaken by BREMER for the globally operating logistics group DSV based in Denmark. The building essentially comprises a logistics hall and a handling hall. The handling hall adjoins an existing office building. The roof areas (approx. 15,600 sqm) are all extensively greened. Approx. 120,000 cbm of earth was placed on the construction site as fill material (up to a height of 7 m).

Description of the facility
The structure of the building consists of a precast reinforced concrete skeleton with trapezoidal sheet metal roof cladding and metal cassette facades. Loading houses, or dock pods, are provided for loading operations. In the halls, a full-area sprinkler system is fed from a single underground sprinkler tank. The fire alarm system also covers the whole area. Along Markgröninger Strasse, a 210 m long gabion wall was erected to a height of up to 7 m.




CONTACT
Advice
Subcontractors
Employment/Training
Directions

 
Sitemap | Disclaimer | Imprint |      © 2011 Footer All rights reserved.