Bremerbau
Deutsch | English
Solid construction to perfection
 COMPANY 
 Business Activities 
 Current contracts 
 Press 
 References 
HomeContactJobsDirectionsDownloads
 
 Locations
 Management
 Strategy and Vision
 Philosophy
 History
 Facts & Figures
 Operations and Production
 The BREMER PRINCIPLE
 Patents
 Environment
 Rail Loading Station
 Photovoltaics
 Geothermal Energy
 Association membership


RAIL LOADING STATION

With the rail loading station for heavy loads, which was connected to the rail network in middle of 2009, BREMER can economically implement construction projects within a radius of 1,500 km. The station for BREMER precast elements from Paderborn has one siding for loading and one siding for stabling vehicles, with two overhead cranes capable of manoeuvring loads up to 50 metric tons. The yard where precast reinforced concrete elements are stored extends over a total area of 3,500 sqm. In making this investment, BREMER is thinking green, switching logistics from road to rail in favour of the environmentally sounder alternative. By using rail transport, BREMER reduces its carbon footprint by 22%.




CONTACT
Advice
Subcontractors
Employment/Training
Directions
Mitglied im

Deutsche Gesellschaft für Nachhaltiges Bauen e.V.
Press Articles


Die Weichen richtig stellen
DB SCHENKER railways 10/2009


Pfeil Download PDF

 
Sitemap | Disclaimer | Imprint |      © 2011 Footer All rights reserved.