Bremerbau
Deutsch | English
Solid construction to perfection
 COMPANY 
 Business Activities 
 Current contracts 
 Press 
 References 
HomeContactJobsDirectionsDownloads
 
 Logistics Buildings
 Refrigerated storage facilities
 LIDL Bake-off in Leverkusen
 LIDL Bake-off in Burbach
 TRANSTHERMOS deep-freeze storage facility in Oyten
 EDEKA central warehouse in Landsberg
 logistics centre in Bad Wünnenberg
 Deep-Freeze storage facility in Schkeuditz
 logistics centre in Hüfingen
 MUK DEEP-FREEZE STORAGE FACILITY IN MARKGRöNINGEN
 Lidl Distribution Centre in Weert, Netherlands
 Frischecenter in Meckenheim
 Logistics centre in Grossbeeren
 Nextparx in Gross-Gerau
 Central warehouse in Paderborn
 Central warehouse in Freienbrink
 Freezer warehouse in Frankfurt
 Logistics centre in Oberhausen
 Stadiums
 Furniture Stores
 Production Facilities
 DIY Centres
 Retail Facilities
 Multi-Storey Car Parks
 Office Buildings


logistics building in Großbeeren
   
  Facts & Figures    Pictures

Building data
Location: Großbeeren
Floor area: 16,000 sqm
Length/width/height: 128/106/14; 48/72/14 m
Type of building: temperature-controlled buildings  
Scope of supply and services: turnkey 
Year of construction: 2010 
Period of construction: April 10 - Oct. 10 

Special features
After contracts in Stapelfeld and Oberhausen, this third project in Grossbeeren marks the continuation of a successful partnership with Lekkerland that dates back to 1998.

Description of the facility
The structure of the logistics building consists of BREMER precast reinforced concrete elements. The facade is realised with 4 m high reinforced concrete base panels and steel cassettes. Part of the outer facade is formed by the integrated cold and deep-freeze cells. More office and storage space is accommodated in a two-storey internal structure that similarly consists of precast reinforced concrete elements.

More pictures



CONTACT
Advice
Subcontractors
Employment/Training
Directions

 
Sitemap | Disclaimer | Imprint |      © 2011 Footer All rights reserved.